Diagnostic and Maintenance Services

Partial Discharge Monitoring of HV Transformers and Switchgears

Scope of Service

Technical Capabilities

  • Electrical discharges that do not completely bridge the electrode.
  • Cause deterioration and eventual failure of the insulation layer.
  • As per IEEE statistics Partial discharge is cause of 85 % of faults in High voltage Equipment.
  • Switchgear insulation is difficult to test during routine maintenance. Insulation failure can be devastating.
  • Many failures of HV insulation are associated with Partial Discharges.
Execution & Delivery

Results and
documentation.

Standard turnaround
3–5 business days for standard reports.
Report format
PDF report with findings, analysis, recommendations, and supporting documentation.
Rush requests
Confirm same-day or next-day express service availability with the team.

Methods & Standards

ASTM

Methodical approaches for accuracy and reliability.

ISO/IEC

International quality standards.

Quality Control

Verification at every stage of the process.

Your Technical Inquiry

Let's clarify
your service requirements together.

Contact Us