Scope of Service
Technical Capabilities
- The test enables predictive maintenance on motor and turbine generator stator windings, resulting in increased availability
- and extension of operating life.
- The technique was introduced over two decades ago and has
- since been applied to over 6000 motors and turbine generators to identify deteriorated stator windings.
- It is by far the most popular method in the world for
- measuring motor and generator partial discharge (PD).
- The method is non-destructive and based on sound scientific and empirical principles, and is recommended by manufacturers and industry standards such as the IEEE Std. 1434-2000.

Execution & DeliveryResults and
Results and
documentation.
- Standard turnaround
- 3–5 business days for standard reports.
- Report format
- PDF report with findings, analysis, recommendations, and supporting documentation.
- Rush requests
- Confirm same-day or next-day express service availability with the team.
Methods & Standards
ASTM
Methodical approaches for accuracy and reliability.
ISO/IEC
International quality standards.
Quality Control
Verification at every stage of the process.
Your Technical InquiryLet's clarify
Contact Us 