Service Gallery
Work examples



1 / 2
Overview
About this service
- Highly accurate periodic PD survey of HV/MV power cables eliminates risk of unplanned outages.
- Precise PD localization (within 0.2% to 1% of cable length) minimizes maintenance expenditure.
- Accurate categorization of different activities captured by system. Robust and rugged design to maximize portable operation life and support inspections / testing for extended period of time.
- Advanced denoising and filtering help to remove background noise efficiently.
- Failure in cable insulation is generally preceded by partial discharge and subsequent degradation phase.
- Detecting partial discharge at the early stage of degradation helps in preventing sudden failure.
Delivery
Turnaround & Delivery
Typical Turnaround
3-5 business days for standard reports
Report Format
Detailed PDF report with findings, analysis, recommendations, and supporting documentation
Urgent Options
Express service available for urgent cases with same-day or next-day turnaround
Standards
Methods & Standards
ASTM Standards
Following ASTM guidelines for precision and reliability
ISO/IEC Standards
Compliance with international quality standards
Quality Assurance
Rigorous quality control at every step of the process
Ready to commission this service?
Contact us for a customised quote and expert consultation.